Key Dates
September 14 2021
Public Open House
A public open house was held at Cedarcrest Park between 4:00 and 6:00 p.m. Come share your feedback on mobility and safety at this intersection and view the traffic data and proposed intersection control device trial planned for later in September.
September 27 2021
Device Trial #1 Installed
Device trial #1 includes stop control on 89th Street approaches and curb bump outs around the SW and NE quadrants of the intersection for traffic calming. Device trial #1 was in place from the week of 9/27/21 to 11/1/21.