September 14 2021

Public Open House

A public open house was held at Cedarcrest Park between 4:00 and 6:00 p.m.  Come share your feedback on mobility and safety at this intersection and view the traffic data and proposed intersection control device trial planned for later in September.

September 27 2021

Device Trial #1 Installed

Device trial #1 includes stop control on 89th Street approaches and curb bump outs around the SW and NE quadrants of the intersection for traffic calming.  Device trial #1 was in place from the week of 9/27/21 to 11/1/21.

November 01 2021

Device Trial #2 Installed

Device trial #2 includes a traffic circle in the center of the intersection of 18th Avenue and 89th Street to assign intersection right-of-way and provide traffic calming.

November 29 2021

Resident opinion survey

A resident opinion survey will be mailed to the affected area.