Share Bloomington Ferry Road Corridor Visioning Study on FacebookShare Bloomington Ferry Road Corridor Visioning Study on TwitterShare Bloomington Ferry Road Corridor Visioning Study on LinkedinEmail Bloomington Ferry Road Corridor Visioning Study link
The City of Bloomington is undertaking a corridor visioning study for Bloomington Ferry Road from Ensign/Veness Road to Dred Scott Park/110th Street. This is an opportunity for the City to revisit the needs of all users along Bloomington Ferry Road and create a roadway that better serves the current and future users of the corridor. Once a preferred vision is identified, future pavement, safety and other projects on this corridor will work towards implementing this adopted vision.
Study goals:
better utilize the existing right-of-way to serve all users (motorists, bicyclists and pedestrians);
The City of Bloomington is undertaking a corridor visioning study for Bloomington Ferry Road from Ensign/Veness Road to Dred Scott Park/110th Street. This is an opportunity for the City to revisit the needs of all users along Bloomington Ferry Road and create a roadway that better serves the current and future users of the corridor. Once a preferred vision is identified, future pavement, safety and other projects on this corridor will work towards implementing this adopted vision.
Study goals:
better utilize the existing right-of-way to serve all users (motorists, bicyclists and pedestrians);
improve management of traffic at intersections;
enhance pedestrian crossings;
reduce impervious area and improve stormwater management, and
reduce greenhouse gas emissions
The study aims to work with the roadway users and the community to identify a shared vision for the corridor that will meet local needs and support community growth, ultimately forming the foundation for an effective reconstruction plan and layout that enhances safety, multimodal facilities and connections, access, operational efficiency and environmental resiliency.
Be involved:
Your input will help to identify and prioritize the needs along this corridor. We will keep you informed of the study progress and public engagement opportunities with updates on this study page.
Click in "Stay Informed" to sign up for email updates to stay connected to the study and learn about ways you can be involved. Updates are generated by staff when site content changes.
History of Bloomington Ferry Road:
Prior to the TH 169 river crossing, Bloomington Ferry Road was the Minnesota River crossing in this area. Based on that connection, Bloomington Ferry Road used to serve as a regional connection, so the roadway was designed accordingly. With the TH 169 and Bloomington Ferry Bridge construction, the Bloomington Ferry Road crossing was removed. However, the current roadway geometrics remain the same, a four-lane divided roadway capable of carrying higher traffic volumes than currently experienced. With the change in use of the roadway and the surrounding context, such as retail, parkland including Dred Scott Field, and access to the Minnesota River Valley and Hyland Trail, the thought is that the design of the roadway can be reimaged to meet the needs of current and future users of the corridor and to better align with goals of the City.
Request for Proposal (RFP) for Engineering Services
Bloomington Ferry Road Corridor Visioning Study is currently at this stage
December 2024: Issue Request for Proposal (RFP) for Engineer.
Contract Awarded to Engineering Firm
this is an upcoming stage for Bloomington Ferry Road Corridor Visioning Study
January 27 City Council Meeting authorization of contract to SRF Consulting, Inc.
Existing Conditions Data Collection
this is an upcoming stage for Bloomington Ferry Road Corridor Visioning Study
Investigate Traffic Volume and Parking Data, Crash History, Access Inventory, Land Use, Research Previous Studies
Community Engagement Event #1
this is an upcoming stage for Bloomington Ferry Road Corridor Visioning Study
May 14, 2025 - 4:30 p.m. to 6:30 p.m.
This event will be held at Countryside Park (10240 Bloomington Ferry Road). This event will be a chance for stakeholder along the corridor to offer suggestions for how they envision a future Bloomington Ferry Road corridor.
Community Engagement Event #2
this is an upcoming stage for Bloomington Ferry Road Corridor Visioning Study
Final report
this is an upcoming stage for Bloomington Ferry Road Corridor Visioning Study
The final outcomes of the consultation are documented here. This may include a summary of all contributions collected as well as recommendations for future action.