What other sites were considered?

    Other sites screened included Nord Myr Park, the Water Treatment Plant Site, Hyland Greens Golf Course, Collegeview Park, Normandale Hills Elementary, and West Marsh Lake Park. In one way or another, these other sites did not meet location screening requirements.

    What were the criteria used for site selection?

    Site screening criteria included:

    • Potential for drawdown (interference) in nearby wells
    • Underlying geology
    • Location within a City-owned parcel
    • Distance to City’s Water Treatment Plant
    • Not within or immediately adjacent to 100-year floodplain
    • Not within area of concern for contamination

    Where will the well be located?

    North of 98th Street, south of the volleyball court.

    What will the well look like?

    Images of similar wells in the metro area have been included below. Site design is ongoing, but there will be a driveway, a small enclosure, and likely a small (approximately 8'x8') electrical building (see second picture) present on the site. There will not be a typical wellhouse on this site in order to minimize footprint. Note that the second image shows a site still under construction.