Well 7 Design and Construction

Share Well 7 Design and Construction on Facebook Share Well 7 Design and Construction on Twitter Share Well 7 Design and Construction on Linkedin Email Well 7 Design and Construction link

photo of overflowing drinking waterWell 7 is a future water supply well that is being designed and constructed to replace an existing well which has reached the end of its useful life. In February 2023, Barr Engineering Company completed a feasibility study which evaluated seven potential sites and determined that Tarnhill Park met all site screening requirements. Well 7 will provide raw water capacity to the City’s Water Treatment Plant to help serve present and future water needs of the community.

This site will provide informational updates of the project over the lifecycle of the project.

photo of overflowing drinking waterWell 7 is a future water supply well that is being designed and constructed to replace an existing well which has reached the end of its useful life. In February 2023, Barr Engineering Company completed a feasibility study which evaluated seven potential sites and determined that Tarnhill Park met all site screening requirements. Well 7 will provide raw water capacity to the City’s Water Treatment Plant to help serve present and future water needs of the community.

This site will provide informational updates of the project over the lifecycle of the project.

Ask a Question

loader image
Didn't receive confirmation?
Seems like you are already registered, please provide the password. Forgot your password? Create a new one now.
  • Share How will the construction impact Little Rd area residents' access abilities and water supply? on Facebook Share How will the construction impact Little Rd area residents' access abilities and water supply? on Twitter Share How will the construction impact Little Rd area residents' access abilities and water supply? on Linkedin Email How will the construction impact Little Rd area residents' access abilities and water supply? link

    How will the construction impact Little Rd area residents' access abilities and water supply?

    CR asked about 1 year ago

    No impacts to city water access or residential access are anticipated. There will be small road disturbances, but none of these should impede road use or access to property. The method of installation (horizontal directional drilling) was chosen to minimize disruptions that would normally occur in a traditional open cut installation.

  • Share Where is the current well located? on Facebook Share Where is the current well located? on Twitter Share Where is the current well located? on Linkedin Email Where is the current well located? link

    Where is the current well located?

    LauraC asked about 1 year ago

    Thank you for your question. The existing well is sited near the water treatment plant. Both the rehabilitation of this well and the use of the existing site have been deemed infeasible.

  • Share Will the well construction require laying water lines on Little Rd? When would Little Rd see construction if that is the case? Would the entire road be resurfaced or would you try to lay the lines with only a partial tear up of the road? Where would the well location likely be? on Facebook Share Will the well construction require laying water lines on Little Rd? When would Little Rd see construction if that is the case? Would the entire road be resurfaced or would you try to lay the lines with only a partial tear up of the road? Where would the well location likely be? on Twitter Share Will the well construction require laying water lines on Little Rd? When would Little Rd see construction if that is the case? Would the entire road be resurfaced or would you try to lay the lines with only a partial tear up of the road? Where would the well location likely be? on Linkedin Email Will the well construction require laying water lines on Little Rd? When would Little Rd see construction if that is the case? Would the entire road be resurfaced or would you try to lay the lines with only a partial tear up of the road? Where would the well location likely be? link

    Will the well construction require laying water lines on Little Rd? When would Little Rd see construction if that is the case? Would the entire road be resurfaced or would you try to lay the lines with only a partial tear up of the road? Where would the well location likely be?

    dadamseast asked about 1 year ago

    Thank you for your question. The FAQ has been updated with a location description.

    New raw watermain will be installed via a trenchless method as opposed to an open cut trench. This will minimize impacts to the road and eliminate the need to resurface the entire road. The schedule is highly sensitive to an unpredictable permitting process, but raw watermain construction is currently anticipated between September 2024 and June 2025. 

Page last updated: 25 Oct 2024, 07:50 AM